Small appliances, cookware, tableware, storage and cleaning products — voltage-correct, plug-correct and certified for your market before they load.
家电厨具
Appliances fail in export for two mundane reasons: the wrong plug and the missing certificate. Both are entirely avoidable, and both are decided at specification, weeks before anything is made.
Beyond that, this is a category where the honest question is whether the product is built for daily use or for a shelf. We will tell you which one a given factory is offering.
Do not have all of this? That is normal. Send what you have — a photo, a competitor link, a sample — and we will build the specification with you.
Indicative only, and quoted honestly rather than optimistically. Actual figures depend on specification, season and factory loading — and lead time starts from approved sample, not from enquiry.
| Item | Typical MOQ | Production lead time |
|---|---|---|
| Small appliances | 500–1,000 pcs per model | 25–40 days |
| Cookware sets | 500–1,000 sets | 25–35 days |
| Ceramic tableware | 1 x 20ft | 30–45 days |
| Fans / cooling | 500–1,000 pcs | 25–35 days |
| Cleaning products | 1,000+ pcs mixed | 15–25 days |
We take your specification to the right cluster, shortlist factories with a track record in exactly this product, and return options with pricing, MOQ and lead time side by side.
Sample approval, then in-line and pre-shipment inspection against a written checklist, with photographs, while the goods are still in China and still fixable.
Consolidation, packing, freight booking and the full document set — invoice, packing list, certificate of origin, bill of lading and any inspection certificate your market requires.
Send a photo, a drawing, a link or a sample reference on WhatsApp — you will have a considered reply, usually within one working day.