FF&E, linen, amenities, tableware and back-of-house equipment — coordinated as a project, delivered against an opening date.
酒店用品
A hotel fit-out is not a purchase; it is a deadline. Every item has to arrive before the opening, in the right rooms, matching a specification agreed months earlier — and a single late container delays a launch that has already been marketed.
We handle hospitality as a project with a critical path, consolidating furniture, linen, tableware and equipment from multiple factories into scheduled shipments.
Do not have all of this? That is normal. Send what you have — a photo, a competitor link, a sample — and we will build the specification with you.
Indicative only, and quoted honestly rather than optimistically. Actual figures depend on specification, season and factory loading — and lead time starts from approved sample, not from enquiry.
| Item | Typical MOQ | Production lead time |
|---|---|---|
| Bedroom FF&E | 20–50 rooms | 45–70 days |
| Hotel linen | 200–500 sets | 30–45 days |
| Tableware | 1 x 20ft | 35–50 days |
| Restaurant furniture | 50–100 sets | 35–50 days |
| Kitchen equipment | Per project | 45–75 days |
We take your specification to the right cluster, shortlist factories with a track record in exactly this product, and return options with pricing, MOQ and lead time side by side.
Sample approval, then in-line and pre-shipment inspection against a written checklist, with photographs, while the goods are still in China and still fixable.
Consolidation, packing, freight booking and the full document set — invoice, packing list, certificate of origin, bill of lading and any inspection certificate your market requires.
Send a photo, a drawing, a link or a sample reference on WhatsApp — you will have a considered reply, usually within one working day.